Electric Gate Installation in London: 8 Things to Check Before You Buy
- Kate Lyon
- Apr 19, 2020
- 10 min read
Updated: Jul 14
The gate design is only one part of an electric gate installation.
Before fabrication begins, you need to know whether the gate can move safely, whether the driveway has enough space, where the electricity will come from and how residents, visitors and delivery drivers will enter.
London properties often make these decisions more complicated.
A narrow driveway in Chelsea may not have room for conventional swing gates. A sloping entrance in Hampstead may require a sliding or bi-fold system. A listed property in Kensington may also need planning or listed-building consent before work begins.

Here are eight things to check before ordering electric gates for your London property.
1. Choose the right gate movement for the driveway
The first decision is whether the entrance needs swing, sliding, cantilever or bi-fold gates.
Do not choose based on appearance alone. The gate must suit the available space, ground levels, traffic and surrounding boundary.
Swing gates
Swing gates open using one or two hinged leaves.
They can work well where the driveway has enough depth for the leaves to move without striking vehicles, walls or people.
Before selecting swing gates, check:
How far the leaves need to open
Whether the driveway slopes
Where vehicles will wait
Whether the gates could obstruct a pavement
Wind exposure
The position of posts or brick pillars
Whether the leaves will open inwards or outwards
Large, solid gate leaves can catch significant wind. The installer must consider this when specifying the hinges, posts, foundations and motors.
Sliding gates
Sliding gates move sideways along the boundary.
They can suit short or sloping driveways because they do not need the same opening space behind the entrance. However, they require enough clear space beside the driveway for the gate to travel.
The installer should assess:
The total run-back space
Ground stability
Track drainage
Pedestrian access
Nearby fencing or walls
Possible trapping and shearing areas
Whether a tracked or cantilever system is more appropriate
Bi-fold gates
Bi-fold gates use folding leaves and may suit entrances where both driveway depth and side space are limited.
They require more hinges and moving points than conventional gates, so the mechanical design and safety assessment need particular attention.
Read our sliding versus swing electric gates guide for a detailed comparison.
2. Check whether you need planning permission
Many residential gates can be installed under permitted development rights, but this is not automatic.
In England, planning permission will generally be required where a gate beside a highway used by vehicles—or the footpath of that highway—exceeds one metre in height.
For boundaries elsewhere, the usual permitted-development height is two metres. (planningportal.co.uk)
Additional permission may be required when:
The property is listed
The gate is within the curtilage of a listed building
The property is in a conservation area
An Article 4 direction applies
A planning condition removed permitted development rights
The entrance or boundary is being significantly altered
A new dropped kerb or vehicle crossover is required
You should also check whether restrictive covenants, lease conditions or estate-management rules apply.
Planning approval and gate safety are separate matters. Receiving planning permission does not confirm that the powered gate has been safely designed.
Read our planning permission for electric gates in London guide before approving the final height and design.
3. Assess the entrance, foundations and existing structures
An electric gate places repeated forces on its posts, hinges, tracks and foundations.
Existing brick pillars may look solid but still be unsuitable for automation. They may contain loose brickwork, shallow foundations or no suitable fixing point for the motor.
A proper survey should assess:
Gate-opening width
Driveway depth
Ground levels
Drainage
Soil and foundation conditions
Existing walls and pillars
Hinge positions
Space for motors
Cable routes
Sliding-gate run-back
Pedestrian and vehicle movement
Access for excavation and installation equipment
A sliding gate requires a stable, accurately prepared base.
Swing gates need correctly aligned posts or pillars capable of supporting the weight and movement of the gate leaves. Underground motors may also require drainage arrangements to reduce the risk of standing water around the operator.
The Planning Portal notes that gates and boundary structures must remain structurally sound and maintained, even where building-regulation approval is not normally required for the gate itself. (planningportal.co.uk)
Do not assume that existing manual gates can simply be fitted with motors. The gates, hinges, posts and surrounding area must first be checked for suitability.
4. Plan the power supply before installation starts
Most electric gates use a mains electrical supply connected from the property.
The cable route should be planned before finished driveways, paving or landscaping make access more difficult.
The installer and electrician may need to consider:
Distance from the consumer unit
Suitable circuit protection
Electrical isolation
Cable depth and protection
Water resistance
Control-panel location
Earthing arrangements
Power for intercoms and access controls
Future maintenance access
Battery-backup requirements
Do not run an ordinary extension lead to the gate or leave temporary connections as a permanent supply.
The system will normally continue using a small amount of electricity in standby so that the receiver, control panel and safety devices remain ready.
Our guide to how much electricity electric gates use includes worked residential and commercial running-cost examples.
What if mains power is difficult to install?
A solar-powered system may be possible where a mains cable would be difficult or disproportionately expensive.
Suitability depends on:
Gate size and weight
Motor requirements
Daily opening cycles
Shade from buildings or trees
Seasonal daylight
Battery capacity
Intercom and access-control consumption
Solar should be assessed as a complete system. It should not be selected simply because the gate is far from the house.
5. Design safety into the complete gate system
Safety cannot be added as an afterthought.
A powered gate is machinery. The gate leaves, motors, control panel, safety devices, posts, hinges and surrounding structures must operate together safely.
The Health and Safety Executive says a powered gate must respond safely whenever someone interacts with it. The design must consider foreseeable misuse, children playing nearby, wear, wind, rain, snow and debris. (hse.gov.uk)
The site-specific assessment should consider hazards including:
Crushing between a gate and a wall
Trapping around hinges
Shearing beside a sliding gate
Impact with vehicles or pedestrians
Fingers reaching through openings
Access to gears or drive mechanisms
A gate leaving its track
Uncontrolled movement on sloping ground
Failure during high winds
Electrical faults and water ingress
Depending on the gate, protection may include:
Pressure-sensitive safety edges
Photocells
Laser scanners or light curtains
Fixed guards
Safe separation distances
Force limitation
Controlled operating speeds
Vehicle-detection loops
Warning lights
Hold-to-run controls in certain situations
A pair of photocells does not automatically make the installation safe.
Basic beams may help detect vehicles but may not protect someone standing beside a hinge, behind a sliding gate or between the gate and a fixed structure. The required safety measures depend on the hazards present at that particular entrance. (hse.gov.uk)
Read our guide to electric gate safety responsibilities for more information about installers, owners, landlords and maintenance contractors.
6. Choose access controls around the users
The best access-control system is not necessarily the one with the most technology.
It is the one that gives each user a practical and secure way to enter.
Available options include:
Remote-control handsets
Keypads
Audio intercoms
Video intercoms
Smartphone apps
GSM access
Fobs or cards
Number-plate recognition
Timed access permissions
Vehicle-detection loops
A private house may only need remotes and a video intercom.
An apartment block may need separate permissions for residents, managing agents, contractors and delivery drivers. A commercial site may need recorded access, individual credentials and restrictions outside working hours.
Before choosing the system, ask:
How many people need access?
How will visitors contact the property?
Do delivery drivers need entry?
Is separate pedestrian access required?
What happens when someone loses a remote or fob?
Can temporary users be removed easily?
Is a mobile signal or internet connection required?
Are there monthly SIM or software charges?
What happens during a power cut?
Does the system need to connect with CCTV or an alarm?
Do not share one permanent keypad code with everyone who visits the property.
Where possible, use individual or temporary credentials that can be cancelled when no longer required.
Our smart electric gates guide explains app control, intercoms and connected access systems in more detail.
7. Budget for the complete installation
The quoted cost should cover more than the gate leaves and motors.
A full electric gate installation may include:
Design and site survey
Planning drawings or applications
Gate fabrication
Protective finishes
Posts or brickwork
Foundations and drainage
Tracks or cantilever supports
Motors and control panels
Electrical supply
Safety equipment
Intercoms and access controls
Pedestrian gates
Installation labour
Testing and commissioning
Waste removal
Handover documents
Ongoing servicing
Ask whether the quotation includes VAT and whether any provisional sums could change after excavation begins.
A quotation should also identify exclusions.
For example, the installer may not be responsible for:
Planning-application fees
A new dropped kerb
Asbestos removal
Major drainage alterations
Repairs to concealed utilities
Internet or mobile subscriptions
Decorative brickwork outside the agreed scope
Landscaping after the installation
Avoid comparing quotations based only on the headline figure.
A cheaper quotation may exclude foundations, electrical work, safety equipment, access controls or final testing.
Read our electric gate cost guide for London for current guide prices and a breakdown of the main cost factors.
8. Check installation, handover and aftercare
The job is not finished when the gate opens and closes.
The completed gate should be commissioned, tested and handed over with clear instructions.
The HSE says installers must follow relevant manufacturer instructions and leave the gate in a safe condition. When separate components are assembled into a powered gate, the person responsible for the finished machine may also need to complete the applicable conformity assessment, documentation and user information. (hse.gov.uk)
At handover, ask for:
User instructions
Manual-release instructions
A demonstration of the release mechanism
A Declaration of Conformity
Identification of the responsible installer or manufacturer
Details of safety devices
Testing or commissioning records
Maintenance recommendations
Warranty information
Emergency contact details
Keys, remotes and access credentials
Watch the gate complete several full cycles.
Make sure you understand:
How to stop the gate
How safety devices respond
How to release it during a power cut
How to re-engage the motor
How to report a fault
When servicing is due
Which settings users must not change
The manual-release key should be stored securely where authorised users can reach it during an outage.
Our electric gate power-cut guide explains how manual release and battery backup work.
How long does an electric gate installation take?
The timescale depends on the project.
A straightforward automation installation on suitable existing gates may take less time than a fully bespoke installation requiring fabrication, new pillars, foundations, drainage, electrical work and access controls.
The complete timeline may include:
Initial enquiry
Site survey
Design and quotation
Planning approval, where required
Gate fabrication
Groundworks
Electrical preparation
Gate and motor installation
Access-control setup
Safety testing
Handover
Do not judge the project only by the number of days installers are physically on site.
Bespoke fabrication and planning approval can account for a significant part of the overall programme.
Can existing driveway gates be automated?
Sometimes.
Existing gates should be checked for:
Structural condition
Gate weight
Free movement
Hinge condition
Post stability
Wind loading
Suitable motor positions
Electrical access
Crushing and trapping points
Space for safety devices
A manual gate may appear to work well but still be unsuitable for powered operation.
For example, a person can adjust how hard they push a stiff gate. A motor may continue applying force until a control or safety device tells it to stop.
Automating existing gates creates a powered machine and should receive the same site-specific safety assessment as a new installation.
Read our DIY electric gate installation guide before considering an automation kit.
Questions to ask an electric gate installer
Ask potential installers:
Who will be responsible for the completed powered gate?
How will you assess crushing, trapping and shearing hazards?
Are the gate, motor and safety equipment being specified together?
What foundations and drainage are included?
Who completes the electrical work?
How will the gate operate during a power cut?
Which safety devices are included?
Will force or safety testing be completed?
What documents will I receive?
What servicing schedule do you recommend?
What is excluded from the quotation?
Who handles planning permission if it is needed?
Can I see examples of similar London installations?
What warranties apply to the gate, finish, motors and labour?
Who should I contact if the gate stops working?
A professional installer should be able to explain the proposed system clearly without hiding behind technical language.
Electric gate installation mistakes to avoid
Common mistakes include:
Buying the motor before surveying the gate
Choosing swing gates without checking driveway depth
Ignoring the driveway slope
Fitting automation to weak posts or hinges
Assuming photocells cover every hazard
Leaving the electrical supply until the end
Forgetting pedestrian access
Failing to plan for delivery drivers
Overlooking planning restrictions
Choosing access controls that require poor mobile coverage
Ignoring future maintenance access
Comparing quotations that include different work
Not receiving handover documents
Losing the manual-release key
Allowing unqualified people to change safety settings
Correcting these issues after fabrication or installation can be expensive.
A detailed survey at the beginning is usually far more efficient.
Frequently asked questions
How much does electric gate installation cost in London?
The price depends on the gate material, opening width, automation, foundations, electrical work, access controls and site conditions. A survey is needed for a reliable quotation.
Do electric gates need planning permission?
Not always. Permission may be required for taller gates beside a highway, listed properties, conservation areas, Article 4 locations or properties with restrictive planning conditions.
Is a sliding gate better than a swing gate?
Neither is automatically better. Sliding gates can suit short or sloping driveways, while swing gates may be simpler where there is enough opening space. The correct option depends on the property.
Can I install electric gates myself?
You can plan the design and access requirements, but the structural, electrical, automation and safety work should be completed by competent professionals.
Do electric gates need a separate electrical supply?
Most systems require a suitable mains supply, circuit protection and isolation. Battery or solar systems may be possible in certain circumstances.
Can electric gates open outwards?
A gate must not create an obstruction or hazard for road and pavement users. The direction of movement should be reviewed during the survey and may also affect planning considerations.
How often do electric gates need servicing?
The appropriate interval depends on the equipment, daily usage, environment and manufacturer’s instructions. A busy commercial gate may need more frequent attention than a lightly used residential entrance.
What happens if there is a power cut?
The system should have a suitable manual-release process. Compatible battery backup may also provide a limited number of operations.
Should electric gates have photocells?
Photocells are commonly used, but they are not a complete safety solution on their own. The installer must assess all crushing, trapping, shearing and impact hazards around the entrance.
Can electric gates connect to a smartphone?
Many modern systems support smartphone or GSM-based access. The exact options depend on the control panel, connection and access-control equipment.
Arrange an electric gate installation survey in London
A successful installation begins with the driveway, not a motor catalogue.
Electric Gates London designs, fabricates and installs bespoke electric gates for homes, businesses and managed properties across London.
During the survey, we can assess:
Available opening space
Ground levels
Existing walls and pillars
Swing, sliding or bi-fold options
Electrical requirements
Access controls
Safety considerations
Possible planning restrictions
Expected installation costs